GeoPro HF-45
A two-component polyurethane resin for rapid water cut-off, fissure grouting and the treatment of larger water-bearing pathways within soil and rock.
GeoPro water-management systems
Specialist injection systems for controlling active water ingress, sealing fissures and managing connected flow paths in underground mining, geotechnical and civil-engineering environments.
The appropriate system is selected according to flow, pressure, substrate conditions and the required reaction profile.
Injection systems
The injection material is selected according to groundwater conditions, ground permeability, pathway dimensions and the performance required from the treatment.
A two-component polyurethane resin for rapid water cut-off, fissure grouting and the treatment of larger water-bearing pathways within soil and rock.
An ultra-low-viscosity acrylic injection system suited to fine groundwater pathways where controlled penetration and adjustable reaction characteristics are required.
A stable colloidal-silica dispersion developed for permeation grouting and reducing groundwater movement through fine-grained and low-permeability ground.
A low-foaming polyurethane injection system developed for controlled water cut-off, void filling and the treatment of water-bearing pathways in soil and rock.
Product selection, injection geometry, reaction time and installation parameters must be established from the observed geology, groundwater regime and project-specific performance requirements.
Ground-engineering applications
Water-control injection can be incorporated into temporary or permanent ground-engineering works where groundwater movement affects excavation, productivity, ground behaviour or the ability to maintain safe working conditions.
Reduce groundwater inflow and treat water-bearing pathways encountered during tunnel development, enlargement or rehabilitation works.
Control water movement around shaft sinking, underground mine development and active working areas where inflow affects access or operations.
Support groundwater-management measures around deep excavations, retaining systems and below-ground works where permeable layers influence excavation behaviour.
Treat permeable soils, fractured rock and variable geological interfaces to reduce conductivity and interrupt preferential groundwater pathways.
Each application requires a treatment strategy developed around the observed geology, groundwater regime and construction sequence.
Related ground solutions
Groundwater conditions often interact with weak geology, underground voids and excavation stability. Explore related M&T Global solutions that can form part of an integrated, site-specific ground-engineering strategy.
Improve weak or variable ground by increasing stability, reducing permeability and supporting safer excavation and construction activities.
Stabilise fractured, weak or water-affected rock around tunnels, mines, shafts and underground excavations.
Treat underground cavities, abandoned workings and inaccessible ground voids where loss of support may affect stability or performance.
Share your geological conditions, groundwater observations and project requirements with our team. We can help identify an appropriate treatment approach for your tunnel, shaft, mine, excavation or water-bearing ground.